The house at 24 Sussex Drive was originally commissioned in 1866 by lumberman and Member of Parliament Joseph Merrill Currier as a wedding gift for his wife-to-be Hannah Wright.
[5] Although it was his childhood home when his father was Prime Minister, Justin Trudeau has opted to reside at Rideau Cottage, pending a review of work needed to repair 24 Sussex which was in poor condition.
[9] Unlike 10 Downing Street or the White House, 24 Sussex Drive has been used almost exclusively as a place of residence (and therefore its address has never been widely used as a metonym for the Office of the Prime Minister).
Measures put in place after the incident included the addition of several more guards and security cameras to the house's attaché, and the installation of crash-proof barriers within the main gates.
[15] The residence at 24 Sussex Drive is a large, limestone-clad structure set on 1.6 hectares (4.0 acres) on the south bank of the Ottawa River, overlooking Governor Bay, next to the French embassy and opposite the main entrance to Rideau Hall.
After it was decided in 1950 the house would become the official residence of the prime minister, the turret, widow's walk, trim, main gable at the front, verandahs, and porte-cochère were removed and an extension added to the east.
[3] The National Capital Commission (NCC) maintains the house, its property, and a selection of historic furnishings from the Crown Collection for use in the public rooms of the mansion, ranging from musical instruments to chairs, tables, and paintings by famous Canadians.
While Joe Clark and his family were resident at 24 Sussex, the interiors were redecorated, the dining room ceiling receiving gold leaf re-purposed from another project.
Since the renovation of the house in 2001, very little has been spent on upkeep of 24 Sussex Drive, leaving parts of it worn and outdated, including the heating and cooling systems, wiring, and roofing.
[19] On May 6, 2008, the Auditor General reported that the house was in poor condition and needed about $10 million in repairs and upgrades, which would require at least 12 to 15 months of "full access" to complete.
[26] In May 2023, work began to strip the property of asbestos and to remove "obsolete mechanical, heating, and electrical systems" which were the reasons that the building was deemed a fire hazard.
[34] The RCMP is concerned that the 24 Sussex address is too close to a busy road and lacks a buffer zone, so it has even been suggested that the prime minister's residence be moved to a new site that would have sufficient space for official functions, security, and staff.