A2 motorway (Romania)

After the fall of the communism in 1989, construction continued for a short period, but it was finally stopped in 1993 due to lack of financial resources.

[4] The fourth, from Drajna to Fetești (36.8 km), was built by a joint venture between Astaldi, Max Bögl and CCCF, and was completed in 2007, receiving financial support from the ISPA funds.

[6] The section from Cernavodă to Medgidia was initially awarded to the French company Colas, but the contract was terminated in April 2011, because of delays in the construction process.

[1][2] It includes a 3.8 km link segment at the eastern end,[9][10] that was part of the construction contract for the A4 motorway,[11] which serves as the Constanța bypass.

[12][13] During summer, heavy traffic (maximum permissible weight over 7.5 t) is forbidden to drive on the motorway on weekends (including Friday) at daylight hours (from 6 A.M. to 12 A.M.).

CFR line 800 running parallel with the A2 motorway at Cernavodă
Oldest section of the motorway, Cernavodă bridges system (over Danube ) inaugurated in 1987 (birds eye view)
A2 motorway runs parallel with CFR Line 800 for many kilometers
A2 motorway between Medgidia and Constanța
Interchange with A4, seen approaching from Medgidia