AS-105

As on the previous mission, the boilerplate service module was equipped with a test installation of a reaction control engine package.

The primary flight objective was to continue demonstration of the launch vehicle's iterative guidance mode and evaluation of system accuracy.

The launch was normal and the payload was inserted into orbit approximately 10.7 minutes after lift-off.

Pegasus 3 was a 1423.6 kilogram (3138.6 pound) micrometeoroid detection satellite, which was bolted to the S-IV.

This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.