Ahuntsic station (Exo)

It was built on an existing CN railroad bridge over Boulevard de l'Acadie, which also underwent partial reconstruction and structural reinforcement.

Although it is located relatively close to Chabanel station on the Saint-Jérôme line, they are not considered a transfer site.

Across Boulevard de l'Acadie is a secondary access with exterior stairs Two untitled murals by Sylvain Bouthillette are located outside the headhouse.

Exo's ALP-45DP dual-mode electro-diesel locomotives transitioned from electric to diesel mode as they continued north along the line.

Once the REM mainline is completed sometime in mid-2025, a new station called Côte-de-Liesse will open, expressly designed to ensure smooth transfer of users between the Mascouche line and the REM, and replacing Ahuntsic station as the line's new terminus.