The first improvements to the rivers above Knottingley were completed in 1704 when the Aire was made navigable to Leeds and the Calder to Wakefield, by the construction of 16 locks.
In the 1860s, compartment boats were introduced, later called Tom Puddings, from which coal was unloaded into ships by large hydraulic hoists.
[2] The Aire and Calder still fulfils its original purpose of linking Leeds and Wakefield with York and the Humber (and thence the Trent), although the routes by which this is achieved have changed significantly.
More recent canals now also make the Navigation a vital link in the English and Welsh connected inland waterway network.
The Selby Canal connects to the Ouse, from where boats can travel upstream to reach York, Boroughbridge and Ripon, or downstream to the River Derwent.
The traders of Leeds were keen to have a navigable link to the town, to make easier the export of woollen cloth, but bills presented to Parliament in 1621 and 1625 had failed.
William Pickering, who was mayor of Leeds, had made further attempts to obtain an act of Parliament for improvements to the river in 1679, again without success.
John Hadley was engaged as the engineer immediately, and by 1704 the original work was completed, including 12 locks on the Aire between Haddesley and Leeds and 4 on the Calder.
Regular dividends at 7 per cent were paid to the shareholders from 1718, and the navigation was leased to various groups, who would be responsible for collection of tolls and repairs.
The early trade consisted mainly of woollen goods from Leeds, Wakefield, Halifax and Bradford, with wool and corn from Lincolnshire and East Anglia travelling in the opposite direction.
In 1744, the undertakers bought some land at Airmyn, and developed warehousing and wharfage there, as a more convenient point than Rawcliffe, where the water was shallower.
During 1772, they asked Smeaton to survey a route to avoid the lower Aire, but his assistant, William Jessop actually carried out the work.
With Parliament not reaching a decision, they reworked their plan, which was now for a 5+1⁄4-mile (8.4 km) canal from Haddlesey to Selby, with a new cut from Ferrybridge to Beal, and improvements above Castleford.
[6] Selby was the upper limit for seagoing ships at the time, and became a major transhipment port for the smaller boats using the canal.
With revenue from tolls reaching £82,092 in 1818, which enabled a dividend of £54,000 to be paid, the company was in a healthy state, and proposed their own route from Haddlesey to the Dutch River.
It included a clause to ensure that the Selby Canal was maintained with a depth of water of 5 feet (1.5 m), and made provision for extensions to Goole docks.
Work started on a new cut at Castleford and on the line to Leeds, but legal action over the Selby Canal meant that it had to be made deeper and wider in 1832 and 1833.
The Leeds line was completed in April 1835, somewhat later than anticipated, as the banks were made more substantial, to cope with steam tugs, which would be introduced in due course.
[10] The Aire and Calder tried to work with the railways when they arrived in the 1840s, by making traffic agreements, but still suffered a significant drop in trade.
[18] During the 1960s, the navigation underwent another modernisation scheme, in which the locks from Goole to Leeds were upgraded and enlarged to accommodate vessels conforming to the 600-tonne Euro-barge standard.
[24] The main problem with upgrading the Wakefield branch was the dimensions of George Leather's cast iron aqueduct over the River Calder at Stanley Ferry.
Structural analysis showed that parts of the ironwork were overloaded, and so in 1981 a new concrete aqueduct was cast by John Laing Construction Ltd, on a site a little further upstream.
The complete structure was then pushed into position by hydraulic jacks in a six-day operation, after which the navigation was diverted over it, although the old aqueduct was left in place and can still be used.
The failure resulted in some 780,000 cubic yards (600,000 m3) of material, including the banks of the river and the canal, slipping into the workings, which then flooded to a depth of 230 feet (70 m), creating a lake which covered 250 acres (100 ha).
Starting in 1967, Cawoods Hargreaves used trains of three tubs or coal pans, which were rigidly connected, and pushed by a tug when loaded.
The trains were filled with coal using canalside chutes at the colliery and pushed to the power station, where a hoist lifted each pan from the canal and upturned it to drop its contents onto a conveyor belt.
[29] Experiments were made with trains of four pans, which allowed copper pipes to be carried on top of the coal for delivery to Goole, but this was short-lived.
[33] The concept failed after 18 months, as the dock workers at Hull blacklisted the entire British Waterways fleet, because they believed that the system would threaten their jobs.
600 tonne vessels, designed to make maximum use of the locks, produce considerable wash, and are not as manoeuvrable as a narrow boat.
The eastern part of the Navigation, sometimes known as the Knottingley and Goole Canal, is rather different: it has long straight stretches, but mainly through flat land that has always been agricultural.