Amir Temur Xiyoboni (Tashkent Metro)

It is a transfer station to Yunus Rajabiy, Yunusobod Line.

The station was opened on 6 November 1977 It was part of the first section of the Chilanzar line between October inkilobi and Sabir Rakhimov.

[1] It is a column-type station with two underground vestibules, combined with pedestrian subways.

Floor slabs are hidden behind a false ceiling, lighting fixtures installed in the beams.

Earlier, the walls of the track tunnel had panels of hammered copper made by sculptors V. Lunev and L. Ryabtsev.

Station entrance