Arbor View High School

[4] Arbor View was built at a total cost of $54 million, with construction beginning in March 2004 and completion occurring in August 2005.

At completion it formed the largest school in the district, with a campus area of 40 acres (16 ha) and four buildings with a total of 330,000 sq ft (31,000 m2) of floor space.

[6] Arbor View High School is an architectural prototype, featuring a mall-style design with four two-story corner "houses" and a shared central esplanade.

Additionally, portable classrooms are used to maintain the increasing number of students enrolling at the school each year.

[8] The Arbor View Girls Track and Field Team won the NIAA Nevada State Championships in the 4A division during their 2023-2024 season.