The building was opened in 1936, and re-constructed in 2009 at a cost of 6.5 million TL.
The complex was the venue of the Adana Demirspor waterpolo team.
Olympic length Atatürk swimming pool features:[1] Olympic length outdoor 100.Yıl swimming pool features: Semi-olympic length indoor swimming pool features:
In addition, the fitness centre is equipped with cardiovascular conditioning equipment, strength training equipment, and free weights.
The facility also includes two cafeterias, sauna and multi-purpose rooms.