Processing, drilling and accommodation is based on the jack up rig Baltic Beta located in the field.
The associated gas is transmitted by pipeline to the combined heat and power (CHP) plant in Wladyslawowo.
[1] This exploratory work was carried out by Petrobaltic a Polish state-owned enterprise, but with shareholders in Russia and East Germany.
[1] Its priorities shifted from exploratory drilling to appraisal with a view to producing commercial quantities of oil and gas.
[1] The jack up rig Baltic Beta was located on the field to undertake the processing of well fluids and provide the accommodation.
In 2001 compression facilities were added to Baltic Bravo and a 75 km 115 mm diameter pipeline to transfer gas to the CHP plant at Władysłwowo.
[2] The B3 field production of crude oil and liquid gas during the period 2008-15 is shown in the following table.