Bankhead Station provides connecting bus service to Donald Lee Hollowell Highway, Maddox Park, and the future Westside Park at Bellwood Quarry; which will be the largest park in the city of Atlanta Unlike most MARTA stations, which are provisioned for eight rail cars, Bankhead can only accommodate two cars, with adequate space left in place to allow extension to four cars in the future.
In addition, there is another stub in between the Edgewood/Candler Park and East Lake stations, which would have been called the Tucker-North Dekalb Line.
In December 2005, Bankhead station was the first MARTA station to implement Breeze Cards, and there was a controversy when it was discovered that the fare gates ended 15 inches (380 mm) from the ground, which allowed fare evaders to crawl underneath the gates.
The issue was fixed by installing plastic bars to the bottom of the gates, reducing the gap to 6 inches (150 mm) and virtually eliminating the possibility of fare evaders crawling through it.
This would allow longer trains to run on the Green Line and could make way for a potential extension towards Cobb County.