According to the Geoscience Australia database,[1] it is also known as the Len Wishaw power station and consists of a 38 MW gas turbine and a 15MW steam turbine.
The steam turbine at the power station is to be taken offline.
[4] Enertrade acquired the station and associated gas pipeline in June 2003.
[5] With the dissolution of Enertrade in May 2007, the station and pipeline were acquired by Ergon Energy Queensland Pty Ltd.[6]
You can help Wikipedia by expanding it.This article about a building or structure in Queensland is a stub.