Once the rail link from Howrah to Delhi was completed in 1866, the East Indian Railway was making constant endeavour to reduce the distance of the Howrah–Delhi main line.
After several surveys, one in 1888–89 and two more subsequently, a route was determined from Dhanbad to Mughal Sarai via Koderma and Gaya.
The major works in this section were a bridge across the Son River at Dehri, and tunnelling and ghat line construction between Gurpa and Gujhandi.
[3] In 1902, a branch line of EIR was opened from Sone East Bank (later renamed Son Nagar) to Daltonganj.
[2] Electrification of the stretch of mainline of this section from Asansol to Netaji SC Bose Gomoh was completed in 1960–61.