Basin Bridge Junction is a station on the Chennai Suburban Railway and serves the locality of Pulianthope & Moolakothalam, the confluence on the Otteri Nullah and Buckingham Canal, in Chennai, India.
It also contains a railway maintenance shed with 19 pit-lines, each measuring 3-ft deep to accommodate about 24 coaches.
GMR Vasavi Diesel Power Plant, which has now been dismantled, was situated on the side of Basin bridge opposite to the railway station.
Diesel pipes are laid from Chennai Port to Basin Bridge for fuel power of the plant.
The project, implemented jointly by the Southern Railways and HCL Infosystems, includes installation of CCTV cameras that would record visuals around the clock and store the data for 30 days, with the footage transmitted and stored using an Internet Protocol system.