Beyond this point, dedicated on-road cycle lanes are segregated from motor vehicle traffic to the Belconnen Skate Park, where it resumes as an off-street path, separated from pedestrians to Aikman Drive.
The route follows Aikman Drive for a short distance before resuming as a shared path behind Canberra International Sports & Aquatic Centre to College Street.
At College Street, pedestrians and bicycles are again separated to the University of Canberra, with the final section to Haydon Drive built as a dedicated cycle path.
A further extension along Battye Street will then run through the Australian Institute of Sport and join the main C3 route near GIO Stadium to Lyneham and onto the city via the Sullivans Creek cycle way.
[7] An additional link from the Belconnen Arts Centre along separated cycle lanes on Benjamin Way was included when the project was originally announced, however no timeframe has been provided for its construction.