[9] While exploring how to design and finance such a rail trail, however, the City also agreed to continue to lease that portion of the grade during the interim on a year-to-year basis to the BPS to operate seasonal trains inland from its Upper Bridge station.
[15][16] The remaining 0.64 miles (1.03 km) of City-owned grade from the City Point turnout to the Belfast/Waldo town line as well as the 30 miles (48 km) of State-owned grade beyond continues to be available to the B&MLRR over which it now operates its scheduled seasonal weekend excursion service from the City Point station to the bogs beyond Waldo, as well as other special event runs and group charters over that and other parts of the line.
[20][21][22] As of 2018, operations have since been moved to their current location, Unity, Maine, while City Point Center Yard and Station is now used as a storage area to store their equipment.
Much of which has been repaired and refurbished for mainline operation, and has aided in tie renewal efforts by the BML, along with the Maine State DOT.
Recent achievements include tie renewal to the point of trackage being FRA Class 1 conditions from the line's western terminus at Burnham Junction, to Thorndike Yard, the location of one of the town's former chicken feed mills, ditching and culvert replacement along the entire rail corridor, tree clearing to allow for safe passage of trains, the full restoration of one former Maine Central Railroad Pullman passenger car, along with a Swedish State Railways dining car, the near full rebuild of BML locomotive 53, and replacement and repair of several grade crossings.