Boeing 787 Dreamliner

[37] Subcontracted assemblies included wing and center wing box (Mitsubishi Heavy Industries, Japan; Subaru Corporation, Japan);[38] horizontal stabilizers (Alenia Aeronautica, Italy; Korea Aerospace Industries, South Korea);[39] fuselage sections (Global Aeronautica, Italy; Boeing, North Charleston, US; Kawasaki Heavy Industries, Japan; Spirit AeroSystems, Wichita, US; Korean Air, South Korea);[40][41][42] passenger doors (Latécoère, France); cargo doors, access doors, and crew escape door (Saab AB, Sweden); software development (HCL Enterprise, India);[43] floor beams (TAL Manufacturing Solutions Limited, India);[44][45] wiring (Labinal, France);[46] wing-tips, flap support fairings, wheel well bulkhead, and longerons (Korean Air, South Korea);[47] landing gear (Messier-Bugatti-Dowty, UK/France);[48][49] and power distribution and management systems, air conditioning packs (Hamilton Sundstrand, Connecticut, US).

[51] On April 26, 2006, Japanese manufacturer Toray Industries and Boeing signed a production agreement involving US$6 billion worth of carbon fiber, extending a 2004 contract.

[71] On November 4, 2008, a fifth delay was announced due to incorrect fastener installation and the Boeing machinists strike, stating that the first test flight would not occur in the fourth quarter of 2008.

[83][84] The crash test was the third in a series of demonstrations conducted to match FAA requirements, including additional certification criteria due to the wide-scale use of composite materials.

Substantial redesign work was expected to correct this, which would complicate increases in production rates;[92] Boeing stated the early 787-8s would have a range of almost 8,000 nmi (15,000 km; 9,200 mi).

[121] In December 2019, it was reported that Boeing had removed the copper foil that formed part of the protection against lightning strikes to the wings of the aircraft; it then worked with the FAA to override concerns raised.

[148][149] Certification cleared the way for deliveries and in 2011, Boeing prepared to increase 787 production rates from two to ten aircraft per month at assembly lines in Everett and Charleston over two years.

[71] It kept the −8 length but its 51.7 m wingspan would have fit in ICAO Aerodrome Reference Code D.[165] It was designed to operate on Boeing 757-300/Boeing 767-200 sized regional routes from airports with restricted gate spacing.

Boeing's accounting method books sales immediately and distributes estimated production costs over ten years for the 1,300 aircraft it expects to deliver during that time.

Ted Piepenbrock, an academic affiliated with MIT and the University of Oxford, projects losses decreasing through the first 700 airliners and forecasts the cumulative deferred costs to peak beyond $34 billion.

[179] From 2019, Boeing was to build 14 787s per month (168 per year), helping to offset the $28 billion in deferred production costs accumulated through 2015 and would add 100 aircraft to the current accounting block of 1,300 at the end of 2017 third quarter.

[193][194] The following month, Boeing admitted that "nonconforming" sections of the rear fuselage did not meet engineering standards, and the FAA was investigating quality-control lapses dating back to the introduction of the 787 in 2011 and considering requiring additional inspections for up to 900 of the roughly 1,000 Dreamliners in service.

[195] A third quality-control issue then emerged, this time with the 787's horizontal stabilizers, and affecting as many as 893 Dreamliners: workers in Salt Lake City had clamped portions of the tail section too tightly, which could lead to premature material fatigue.

[208] The new problems and the extension of the 13 month long disruption to 787 deliveries led to anger from buyers; a slide in the company's stock price; and demands by a subcommittee of the U.S. House of Representatives for a review of the FAA's oversight of the plane.

[218] In February 2023, a further problem, of an analysis error by a supplier related to the 787 forward pressure bulkhead, was identified, leading to a further temporary halt in deliveries (but not in production) and a 5% drop in the company's share price.

[256] The 787 is the first commercial aircraft to have an airframe majority made of carbon fiber reinforced polymer (CFRP), applied in: the empennage, fuselage, wings, doors, and in most other main components.

[260] In the early 2000s, while studying the proposed Sonic Cruiser, Boeing built and tested the first CFRP fuselage section for commercial aircraft, a 20-foot (6.1-meter) long anechoic chamber, which later applied to the Dreamliner.

[263][83] The Occupational Safety and Health Administration (OSHA) later denied Weldon whistleblower status "largely on the grounds that Boeing's 787 design does not violate any FAA regulations or standards".

[300] In December 2011, Boeing started a six-month promotion 787 world tour, visiting various cities in China, Africa, the Middle East, Europe, United States, and others.

[174] In November 2017, International Airlines Group chief Willie Walsh said that for its budget carrier Level the lower cost of ownership of its two A330-200 more than offsets the 13,000 lb (6 t) higher fuel burn ($3,500 on a Barcelona-Los Angeles flight).

[306] Early operators discovered that if the APS5000 Auxiliary power unit was shut down with the inlet door closed, heat continued to build up in the tail compartment and cause the rotor shaft to bow.

[317] In March 2020, Air Tahiti Nui executed a record commercial flight of 9,765 mi (8,486 nmi; 15,715 km), from Papeete to Paris-Charles de Gaulle, on a route that would typically refuel at Los Angeles but was able to fly the Boeing 787-9 non-stop because it was "nowhere near full" due to the COVID-19 pandemic.

[citation needed] Keeping the same wingspan as the 787-8, the 787-9 is a lengthened and strengthened variant with a 20 feet (6.1 m) longer fuselage and a 54,500 pounds (24,700 kg) higher maximum take-off weight (MTOW), seating 296 passengers in a typical two-class cabin configuration over a 7,565 nautical miles (8,706 mi; 14,010 km) range.

Because of the length and additional tail strike protection needed, a semilevered landing gear enables rotation over the aft wheels rather than at the bogie center, like the 777-300ER, and the cabin air conditioning system has 15% more capacity.

[359][needs update] At the start of the November 2017 Dubai Air Show, the 787-10 had 171 orders; Emirates committed to 40 787-10s, in two- and three-class cabins for 240 to 330 passengers, to be delivered from 2022 and with conversion rights to the smaller 787-9.

[373] In 2014, the fourth prototype 787-8 was used for tests including use of sustainable aviation fuel, ceramic matrix composite engine exhaust nozzles, and systems for improved air traffic control (ATC) communications and closer landing approach spacing.

[397] The UK Air Accidents Investigation Branch (AAIB) issued a special bulletin on July 18, 2013, requesting the US FAA ensure that the locator is removed or disconnected in Boeing 787s and to review the safety of lithium battery-powered ELT systems in other aircraft types.

[409][410] On April 22, 2016, the FAA issued an airworthiness directive following a January 29 incident in which a General Electric GEnx-1B PIP2 engine suffered damage and non-restartable power loss while flying at an altitude of 20,000 feet.

[418] On January 16, 2013, both major Japanese airlines ANA and JAL voluntarily grounded their fleets of 787s after multiple incidents involving different 787s, including emergency landings.

[421] On January 16, 2013, the FAA issued an emergency airworthiness directive ordering all American-based airlines to ground their Boeing 787s until yet-to-be-determined modifications were made to the electrical system to reduce the risk of the battery overheating or catching fire.

The Dreamliner logo
The Dreamliner name was announced in July 2003. This logo is painted on many 787s.
Boeing 787 in launch customer All Nippon Airways' blue and white livery
All Nippon Airways launched the 787 program with an order for 50 aircraft in 2004.
Assembly of "Section 41", the nose section of the Boeing 787
The Everett Factory Hall's huge door opens as the first 787 is rolled out. Surrounding the aircraft are guests and the public.
The first public appearance of the 787 on July 8, 2007
The prototype Boeing 787 underwent taxi tests at Paine Field in November and December 2009.
The first 787 taking off on its maiden flight in December 2009
A 787 at the 2010 Farnborough Airshow
The 787-8 received FAA and EASA certification on August 21, 2011.
All Nippon Airways flew the first commercial 787 flight on October 26, 2011.
The 787-3 would feature a reduced wingspan with wingtip devices
A defunct subsidiary of Norwegian Air Shuttle , Norwegian Long Haul operated the 787 as a long-haul low-cost carrier .
Planform view of an Air Tahiti Nui 787-9 showing its 9.6 wing aspect ratio and 32° wing sweep
Front view of a Vietnam Airlines 787-10, the fuselage is 19 ft (5.8 m) wide and 19 + 1 2 ft (5.94 m) high while the fan has a 9.3 ft (2.8 m) diameter
The Boeing 787 flight deck has fly-by-wire controls
Disassembled composite fuselage section of the Boeing 787
Most airlines have a nine-abreast (3–3–3) economy class, although some select an eight-abreast lower density
Airliner cabin with pod-like seats arranged in pairs or alone against the widewalls.
Qatar Airways 787-8 business class cabin in 1–2–1 layout
United Airlines 787-8 in November 2014. United was the North American launch customer for all three 787 variants.
Diagrams of outlines of three different aircraft imposed over one another
Boeing airliners size comparison
787-8
The initial 787-8 is the shortest variant at 186 ft (56.7 m) long, and was introduced into service by All Nippon Airways in October 2011
The longer 787-9 (206 ft; 63 m) was introduced by Air New Zealand on August 9, 2014
Rollout of 787-10 on February 17, 2017. The −10 is the longest 787 variant at 224 ft (68 m).
A 787-10 of Singapore Airlines , the launch customer of the variant
Lufthansa Technik model of 787 VIP interior
The 787th Boeing 787 produced, a 787-9 operated by China Southern Airlines , with special markings.
Three 787s of All Nippon Airways sit grounded at Tokyo Haneda International Airport in late January 2013
The Aft Electronics Bay that held the JAL 787 battery that caught fire
Japan Airlines 787 battery comparison; Left: typical original battery. Right: damaged battery.
N787BA, the first prototype aircraft, on display in the "Flight of Dreams" building at Chubu Centrair Airport , Nagoya
Schematic of the Boeing 787-8: side, top, front, cross-section views