Bolte Bridge

While officially only 490 metres in length, the actual structure appears much longer as it forms part of a 5 kilometre elevated roadway between Flemington Road and the West Gate Freeway.

It spans the Yarra River and Victoria Harbour in the Docklands precinct to the west of the Melbourne CBD.

The bridge was designed by architects Denton Corker Marshall and was built for head contractor Transurban by Baulderstone Hornibrook, construction taking three years from 1996 to 1999 and costing $75 million.

It is the largest balanced cantilever cast in situ box girder bridge in Australia.

The superstructure is built as two independent bridges of variable depth, prestressed concrete box girders, separated by a 1.15 m clear gap between the structures.