Bruce Highway Western Alternative

When completed it will reduce traffic on the Bruce Highway and provide a more convenient means of travel to north and south for residents of new developments in Upper Caboolture and surrounding areas.

[1] As at July 2022 funding of $20 million has been allocated for the planning study.

[1] The alignment for stage 1 runs 8.3 kilometres (5.2 mi) from Caboolture River Road in Moorina to the D'Aguilar Highway in Moodlu, following a fairly straight line along an existing power line easement.

[1] Stage 2 will run approximately 15 kilometres (9.3 mi) from Narangba to Moorina, with corridor options still being evaluated.

[1] The land adjacent to stage 1 of the road is the site of a new regional city to be known as Caboolture West.