Bundaran HI Bank DKI MRT station

Located nearby the Hotel Indonesia (HI) Roundabout (Indonesian: Bundaran Hotel Indonesia (HI)), it is currently the terminus of the North-South Line, as the phase 2 construction of the line is underway.

The station is located in the Gondangdia area of Menteng, Central Jakarta and is built underneath Jalan M.H.

Jakarta MRT users can continue their journey with Transjakarta's Corridor 1 service from this station via the Bundaran HI bus stop located above.

The switch is used to move MRT trains that were originally on the left track to the right, or vice versa.

The station opened on 24 March 2019 (2019-03-24),[1] along with the rest of Phase 1 of the Jakarta MRT.

Construction of the MRT station in November 2014