Burley Hydro

The power output of the hydro scheme is 330 kW with an annual output of 1,400 MWh and is the fourth hydro scheme on the river after the opening of similar power plants at Linton near Grassington, and two further downstream from Burley at Pool-in-Wharfedale and Garnett Wharfe at Otley.

[1] In 2010, a joint venture between Derwent Hydro Power (DHP) and Trade Link Solutions (TLS), developed a new turbine on the site to generate electricity from the water passing through the old mill race.

[8] A fourth plant was reconditioned at an old papermill at Garnett Wharfe in Otley in 2016 as part of an estate build of 240 homes.

[10] Whereas other schemes have used Archimedes' screws in a reverse direction (IE the water flowing through downstream turns the screws and generates electricity), the turbine plant at Burley houses a Kaplan Turbine, which means the water flowing through turns two blades and as it does so, it changes pressure.

[12] The plant was opened by Phillip Davies MP in August 2011 and is designed to feed electricity into the National Grid.