In addition to the usual first, second and third-class passenger equipment seen elsewhere, the Central China Railway had fourth class carriages as well.
These were newly built with the structure of a covered goods wagon adapted for passenger use, intended for use by poor Chinese farmers and seasonal workers.
After the damage from the Sino-Japanese war was repaired, high-end direct services were put into operation in conjunction with North China Transport, such as the "Temma" and "Hiryū" limited express trains between Shanghai and Nanjing.
In November 1942, this 311 km (193 mi) distance was covered in 5 hours 20 minutes, with an average train speed of 58.31 km/h (36.23 mph).
Like the locomotive fleet, the Central China Railway's inventory of passenger carriages and goods wagons was left in shambles after the withdrawal of the Chinese army.