Project units operate in Ambala, Bangalore, Chennai, Secunderabad, Lucknow, Ahmedabad, Jaipur, Danapur, and New Jalpaiguri.
CORE headquarters has Electrical, Signal and Telecommunications (S&T), Civil Engineering, Stores, Personnel, Vigilance and Finance departments headed by Chief Project Directors.
The last sections of 1500 V DC in India, from Chhatrapati Shivaji Terminus, Mumbai to Panvel and Thane to Vashi, were upgraded to 25 kV AC in April 2016.
Indian Railways decided to adopt the 25 kV AC system of electrification as a standard in 1957, with SNCF as their consultant in the early stages,[5][6] later taken over by the "50 c/s Group".
The joint venture was founded in 1954 by several European railway manufacturers and was dedicated to the development and construction of locomotives powered by 50 Hz alternating current.
[6] The first section electrified for operational use was Raj Kharswan–Dongoaposi, on the South Eastern Railway zone, selected due to heavy freight traffic.
The headquarters was moved to Allahabad under the additional general manager in January 1985 and was renamed Central Organisation for Railway Electrification (CORE).
[16] To reduce maintenance costs and improve the reliability of power supply systems, CORE has adopted state-of-the-art technology: cast resin transformers, SF6 circuit breakers or vacuum switchgear, long-creepage solid-core insulators and PTFE-neutral sections.