Galleria Shopping Centre (Perth)

[2] The shopping centre was developed as a joint construction between Colonial Mutual Group and Coles Myer.

Along with this, the entrance to Greater Union on the upper-deck parking lot was removed, and replaced with a small outdoor dining piazza.

[13] On 3 February 2015, a transformer exploded around 9.30am near the Woolworths loading bay area resulting in the deaths of 2 people, others suffered serious burn injuries.

[2] Revised plans for the $350 million shopping centre expansion were later approved on 11 February 2019 – though some elements of the development are not expected to be completed until 2031.

[1] However as of July 2024, apart from minor works and the relocation of a drainage basin, the redevelopment has largely yet to commence, resulting in frustration from the local community and leaving the centre "a shadow of its former self" as retailers have vacated storefronts and parts of the centre have been closed off in anticipation for the delayed redevelopment.