Services to Cannon Street follow the route as far as St Mary Cray Junction where they diverge onto the South Eastern Main Line near Chislehurst.
The final service starts at Luton and goes via London Bridge, Greenwich, Dartford and Gravesend to Rochester before terminating at Rainham in the bay platform 0.
The off-peak timetable consists of two trains per hour from Victoria, calling at Bromley South, Longfield, Meopham, Rochester, Chatham, Gillingham and Rainham.
One service will call at Newington, Sittingbourne, Teynham and Faversham, then all stations to Dover Priory via Canterbury East.
There is an hourly service from Victoria calling at Denmark Hill via the Catford Loop, Bromley South, St Mary Cray then all stations to Gillingham.
A High Speed Service sees two trains per hour from St Pancras International to Faversham via Gravesend and Chatham.
There is one other High Speed Service that runs on a small part of the line, starting from Margate and calling at Broadstairs and Ramsgate before heading to Canterbury West, and Ashford International, then picking up the High Speed Line and calling at the remaining stations to St Pancras International.
A short branch was built during World War One to service the construction of RAF Manston with a junction off the up line at Birchington on Sea.
Heading away from Victoria, between Farningham Road and Longfield Stations, the line which was originally used by Eurostar trains travelling from Waterloo International towards Fawkham Junction to access High Speed 1 still exists, but is currently not in use.
This can also enable long freight trains to be held here, allowing passenger services to pass, therefore removing a potential bottleneck.