Chongqing North Station South Square[1] (simplified Chinese: 重庆北站南广场; traditional Chinese: 重慶北站南廣場; pinyin: Chóngqìng Běizhàn Nánguǎngchǎng), previously known simply as Chongqingbei Railway Station, is an interchange station on Line 3 (straddle beam monorail), Line 10 (heavy rail subway) and the Loop line (heavy rail subway) of Chongqing Rail Transit.
It opened with the first phase of Line 3 on September 29, 2011 as Chongqingbei Railway Station (simplified Chinese: 重庆北站; traditional Chinese: 重慶北站; pinyin: Chóngqìng Běizhàn).
The Loop line section of the station also opened on December 28, 2018.
An island platform is used for Loop Line trains travelling in both directions.
An island platform is used for Line 10 trains travelling in both directions.