An underground station beneath Churchill Square serves the Capital and Metro Lines and is a part of the Edmonton Pedway system.
An at-grade surface platform for the Valley Line is above the underground station at Rue Hull (99 Street) and 102 Avenue, and was opened on November 4, 2023.
At just under 8 m wide (26 ft), the underground platform is narrow by current Edmonton LRT design guidelines.
[5] The system control centre for the Capital and Metro lines is located on the Churchill Station concourse level.
Likewise, Churchill station is equipped with blue emergency help phones which connect with ETS Security.