Conveyor (sternwheeler)

The Conveyor was one of five sternwheelers built for the use on the Skeena River by Foley, Welch and Stewart for construction work on the Grand Trunk Pacific Railway.

Because the tracks had not reached the head of navigation yet, the boilers and other equipment had to be hauled by mule wagon the last 25 miles to the shipyard at Tête Jaune Cache.

In 1912, the Operator and the Conveyor began work on the upper Fraser but were confined to the area around Tête Jaune Cache as it was a season of very low water and river navigation for these large sternwheelers was nearly impossible.

The Conveyor and the Operator worked regularly during the season of 1913 and then were berthed for the winter at Mile 142 on the downriver side of a new low-level bridge that had just been built, which had cut off navigation for sternwheelers to go further upriver.

[4]: 86–91 That was the last race on the upper Fraser River, because that August would bring the onset of World War I and the halting of construction of the Pacific Great Eastern.

The Conveyor and the Operator both ceased work immediately and were hauled out of the river and left to rot at Foley's Cache at Fort George.

Conveyor under GTP bridge at Fort George 1914