[1] It is located approximately 175 km north-west of the state capital Brisbane, and 50 kilometres south-west of Kingaroy and 65 kilometers north of Dalby.
[6][7] The wind farm is located in a hilly area, approximately 5 km to the north-west of the Bunya Mountains.
[12] After twelve months of data capture, the proponents began securing land and pre-feasibility studies started.
[12] In April 2011, some local landholders expressed concerns at a community forum related to health effects and the noise of the wind turbines, some of which would be less than a kilometre from homes.
[15] In June 2021, it was reported that GE Catcon had successfully demolished a faulty turbine tower on 27 May 2021 after faults were discovered during the commissioning process.
The wind turbines are approximately 180 metres (591 ft) in height from the tower base to the tip of the blade.