[1] The station closed on 12 September 1993, after The Vinelander service to Mildura was withdrawn and replaced by road coaches.
A new platform, inaugurated on 25 July 2010, was constructed to cater for the restoration of passenger services from Ballarat to Maryborough.
[3] In 2010, local residents proposed that the disused station building be developed into a community hub, with the support of the Hepburn Shire Council and VicTrack.
[4] The new platform is on the eastern side of the line, with a steel shelter provided for waiting passengers.
The former station building, platform and signal box are on the western side of the line, with a pedestrian subway passing underneath the tracks at the southern (up) end.