[1] At the start of 1847, the SA&MR amalgamated with other companies to form the Manchester, Sheffield and Lincolnshire Railway (MS&LR).
Plans were drawn up in April 1857, but the MS&LR decided that the sum of £400 was too much and dropped the idea; however, they did not return the donation.
When Brown & Co. complained in May 1860 about their loss, the plan was revived and the station was built, with the MS&LR meeting the balance of the £450 total cost.
George Benton of Glossop was contracted for the building work, but the necessary road improvements were provided by Manchester Corporation;[3] the station being adjacent to the dam at the lower end of the Woodhead Reservoir, which belonged to Manchester Corporation.
The station continued to see freight trains travel through until July 1981, when the line between Hadfield and Penistone was closed completely.