David Stott Building

Bedrock Detroit owns and manages the building which began leasing in late 2018 and includes 107 apartment homes and 5 floors of commercial office space.

[7] The advent of the Great Depression brought a halt to all major construction in Detroit: as a result, the David Stott Building was the last skyscraper built in the city until the mid-1950s.

In 2015, the property was again sold to Dan Gilbert who ultimately realized the plan to re-open the David Stott Building as a mixed-use development.

[9] The tower stands 38 stories tall, with three additional floors below street level; when it opened, it was the fourth tallest building in downtown Detroit.

The building rises from a reddish granite base and incorporates buff-colored brick, marble (on the first three floors from the street), and limestone as its surface materials.