[3][4] The structure, shaped like a tapering obelisk, would have housed offices on the lower levels, apartments, a hotel and penthouse residences on the upper floors.
At the very top, a private club was to occupy a 60 m (200 ft) high glass cylinder surrounded by extensions of tower's façade and supported by a structural helix.
[5] Construction was suspended following the discovery that the building would impact flight paths to and from Doha International Airport.
[2] Construction was expected to continue when the Hamad International Airport was completed on reclaimed land approximately 3 km to the east of the current airport.
After the completion of Hamad International Airport, the plans for the supertall skyscraper were scrapped; however, the convention center was successfully built, and opened in 2015.