The reservoir holds approximately 5,000,000,000 m3 (1.8×1011 cu ft) of water, and the generators are capable of producing 750 MW of electricity.
The dam is operated by the Comisión Federal de Electricidad, a state-owned Mexican electric company.
Throughout the construction of the El Cajón Dam, the following is estimated:
This article about a hydroelectric power plant is a stub.
You can help Wikipedia by expanding it.This article about a Mexican building or structure is a stub.