British National Pictures Ltd purchased 40 acres (16 ha) of land on the south side of Shenley Road and began construction of two large film stages in 1925.
After discord among the partners, which by this time included Herbert Wilcox, their solicitor John Maxwell invested and was able to gain control of the company.
Maxwell placed Alfred Hitchcock under contract in a 3-year, 12-picture deal, and after several silents, he was responsible for Blackmail (1929), the first British talkie released, which was produced at the studios.
This was completed in 1948 and work began on Man on the Run followed by The Hasty Heart starring Richard Todd and Ronald Reagan.
The Shenley Road studios were frequently used in the 1960s for productions on film for ABPC's television arm, ABC Weekend TV.
All of these series made extensive use of a townscape standing set constructed at the rear of the studio site, originally for the 1961 Cliff Richard film The Young Ones.
[14][15] In his autobiography A Divided Life he states that "They were years of high hopes, of excitement, often of fulfilment and contrary to what various pundits said after the event, the programme proved a commercial success, returning according to the latest [1992] figures a profit in excess of £16,000,000 on a capital outlay of £4,000,000.
"[16] During the period 1970–73, EMI had a short-lived production and distribution deal with the American MGM film company, after the closure of their MGM-British Studios in Elstree.
[9] In 1974, Andrew Mitchell took over from Ian Scott as managing director of the studios but was almost immediately told to close the facility and lay off all the staff.
This led to subsequent Lucas productions such as the Star Wars sequels and Indiana Jones franchise being made at Elstree and also brought in directors Steven Spielberg and Jim Henson.
The Big Brother house was actually built on top of the studios' old underwater stage where scenes in The Dam Busters (1955) and Moby-Dick (1956) were filmed.
Planning consents to replace the unsafe structures due to the reinforced autoclaved aerated concrete, defects that had been found in the roof are expected, once demolition is completed in August 2024.