Focke-Achgelis Fa 223 Drache

The Drache could transport cargo loads of over 1,000 kg (2,200 lb) at cruising speeds of 121 km/h (75 mph) and altitudes approaching 2,440 m (8,010 ft).

Focke established the Focke-Achgelis company at Hoykenkamp on 27 April 1937 in partnership with pilot Gerd Achgelis, and began development work at Delmenhorst in 1938.

[6] They first produced an enlarged, six-occupant version of the Fw 61, designated Fa 226 Hornisse (Hornet), while contracting out development of the engine, transmission, and rotor hub to BMW's Berlin works.

Now nicknamed Drache ("Dragon") it had a twin-rotor layout similar to the Fw 61, but had a fully enclosed cabin and load bay, with the single Bramo engine mounted in the middle of the tubular-steel body.

[9] The biggest problem, however, was the severe vibration caused by unbalanced driveshafts when the rotors moved out of phase, and this could only be fixed by greater attention to detail on the part of BMW.

Following the helicopter's demonstration at Rechlin, the Ministry issued specifications for five variants:[8] On 5 February 1941, the V1 was lost in an accident following engine failure at an altitude too low for an auto-rotative landing.

[8] Like its predecessors, the V3's body consisted of welded steel tubing covered with treated fabric to save weight and make repairs easier.

The site was struck in June that year by an Allied air raid and destroyed along with the two surviving prototypes and the first seven pre-production machines undergoing final assembly.

[9] The first Drache to emerge from the new factory, the V11, was flown by pilot Karl Bode for a series of information films made for the Air Ministry to demonstrate the Fa 223's abilities.

Loads which included a complete Fieseler Storch aircraft and the fuselage of a Bf 109 were shown being lowered with great precision on to vehicles using the Drache's winch and special quick-release electrical cargo hook.

[14] In early 1944, a Dornier Do 217 crashed high up on the Vehner moor in Lower Saxony, between Osnabrück and Oldenburg, and it was decided to send the V11 to recover the wreckage.

[14] Following the raid the Air Ministry decided that it was useless to pursue the project any further and following the mountain trials Focke was assigned to Messerschmitt's staff.

[16] Only weeks later, Focke received new orders, this time to return to the Focke-Achgelis company and to move the entire operation to Berlin Tempelhof Airport where flight testing was to be resumed, and a production line established to produce 400 helicopters per month.

[16] The V12, after completing a long cross-country flight from Germany, was flown to Mont Blanc to perform a rescue of 17 people trapped on the mountain.

A mechanical link failure resulted in a rotor disintegrating, and, although the machine touched down on its wheels, it was hurled against an embankment and the crew was killed.

The V14 later made two test flights at RAF Beaulieu before being destroyed on 3 October in a crash where the helicopter dropped 18 metres to the ground.

Captured Fa 223