[1] The two-lane highway will have a length of 101.5 km [2] and pass through the Fuzuli, Khojavend, Khojaly and Shusha districts.
[3] The road is being built along the path on which, during the Second Karabakh War, in the fall of 2020, the units of the Azerbaijani Armed Forces reached Shusha and, as a result of fierce battles, liberated it and established the control over this strategically important city on 8 November 2020.
According to Ilham Aliyev, this road will greatly facilitate the travel to Shusha.
[4] Immediately after this trip, the President announced the start of the Ahmadbayli- Fuzuli-Shusha highway construction (101.5 km long and 37.7 m wide).
Anonim&", and the LLC "Azvirt") companies in coordination with the State Agency for Highways of Azerbaijan.