[4] The unfurlable antenna weighing 18 kg has CFRP truss construction with aluminium alloy joints and its parabolic gold plated molybdenum mesh is supported and shaped by cable mesh structures.
ISRO successfully launched INSAT-4E on 27 August 2015, using a GSLV D6 Mk.II rocket flying from the Satish Dhawan Space Centre and inserted into a Geostationary Transfer Orbit (GTO) with injection parameters of 170 km x 35945 km, 19.96 degree inclination.
[10] Third orbit raising operation of GSAT-6 was successfully completed by firing the Apogee Motor for 580.32 seconds at 07:46 hours IST on Aug 30, 2015.
GSAT-6 was successfully positioned in its orbital slot of 83 degree east and collocated with INSAT-4A, GSAT-12, GSAT-10 and IRNSS-1C on September 6, 2015, morning, after carrying out four drift arresting maneuvers.
[12] According to Comptroller and Auditor General of India report submitted to parliament in 20 December 2022, the GSAT-6 satellite has remained largely underutilized since its launch in August 2015 which is almost half of the expected operational life of 12 years.