Gallows Corner

During the 18th century, Gallows Corner was a copse-sided part of the road and, approachable by meagre path only from the south or various small lanes in other directions, a favourite spot for waylaying coaches.

It was close to the site for the gallows, thought to be north of what is now Eastern Avenue (west), on a grassy stretch below Masefield Crescent.

According to the Romford Recorder it was erected in 1970 by Terry and Co; it takes the form of a system of prefabricated units (called the Braithwaite FliWay) that was cheaper and quicker to build than a conventional underpass or cast in-situ flyover.

The bridge was fitted with emergency barriers which meant that traffic was restricted to one lane in the London-bound (westbound) direction only.

[5] Works did not, however, commence in 2018; the local radio station Time 107.5 reported in July 2021 that TfL was planning to submit a bid to the Department of Transport in Spring 2022 to access £50m of Government funding to address the issues with the junction.