[5] Measuring 220,000 meters square, it is 1.6 times as large as the nearby intermodal Futian station.
[6] It is the second four-line interchange hub in Shenzhen after Chegongmiao station.
In the initial opening of the station expansion on October 28, 2022, the station opened Exits 1–7, 12, 18 and 19.
[8] On 7 July 2018, during the construction of the Line 10 part of the station, four electric cables were broken, leading to a massive power cut at the nearby buildings.
The broken cables were repaired six days later.