Due to the thrust required for injecting the satellite in a geostationary transfer orbit (GTO) the third stage was to be powered by a LOX/LH2 Cryogenic engine which at that time India did not possess or have the technological expertise to build.
The aerodynamic characterization research was conducted at the National Aerospace Laboratories' 1.2m Trisonic Wind Tunnel Facility.
[10] The first development flight of the GSLV (Mk I configuration) was launched on 18 April 2001 was a failure as the payload failed to reach the intended orbit parameters.
[11][12] The third stage was to be procured from Russian company Glavkosmos, including transfer of technology and design details of the engine based on an agreement signed in 1991.
The Redundant Strap Down Inertial Navigation System/Inertial Guidance System of GSLV housed in its equipment bay guides the vehicle from lift-off to spacecraft injection.
The digital auto-pilot and closed loop guidance scheme ensure the required altitude maneuver and guide injection of the spacecraft to the specified orbit.
[17] The GSLV uses four L40H liquid strap-on boosters derived from the L37.5 second stage, which are loaded with 42.6 tons of hypergolic propellants (UDMH and N2O4).
In GSLV-F14 mission, a new white coloured C15 stage was introduced which has more environmental-friendly manufacturing processes, better insulation properties and the use of lightweight materials.
The first developmental flight of GSLV Mark I had a 129 tonne (S125) first stage and was capable of launching around 1500 kg into geostationary transfer orbit.
[26][27] The fourth operational flight of GSLV Mark I, GSLV-F06, had a longer third stage called the C15 with 15 tonne propellant loading and also employed a 4 meter diameter payload fairing.
[33] The Reusable Launch Vehicle Technology Demonstration program, is a prototype spaceplane concept created by ISRO.