The project, launched in 1994, was built on the site of one of the few working farms in the area and was city owned at the time (identified as "Farmer's Field" in the planning documents).
[1][2] It was a creative collaboration between SGI, StUDIOS Architecture, SWA Group, and the Planning and Community Development Agency of the City of Mountain View, California.
[citation needed] The objective was to develop in complementary fashion the privately owned corporate headquarters and adjoining public greenspace.
Key design decisions placed parking for nearly 2000 cars underground, enabling SWA to integrate the two open spaces with water features, shallow pools, fountains, pathways, and plazas.
The interior of the headquarters is furnished with items like shade lamps and giant rubber balls and the lobby contains a piano and a projection of current live Google search queries.
[10][11] The Android lawn statues were outside of Building 44 on Charleston Road, and were relocated on the Google campus at 1981 Landings Drive.
Before announcing the construction, Google, through its internal real estate firm, Planetary Ventures, sought permission from the City of Mountain View to build bridges over the adjacent Stevens Creek.
The shuttles are powered by a fuel blend of 95% petroleum diesel and 5% biodiesel and have the latest emissions reduction technology.
[17] Google has another large campus in Mountain View dubbed "The Quad" at 399 North Whisman Road about 3 miles (5 kilometers) from the Googleplex.