It starts from the Habshan onshore field in Abu Dhabi and runs to Fujairah on the Gulf of Oman.
[6] The pipeline was inaugurated on 15 July 2012 when it made its first delivery of Murban crude to Pak-Arab Refinery.
It passes east of Abu Dhabi city, through Sweihan and west of Al Ain.
[10] Siemens together with 3W Networks designed and undertook the complete engineering, procurement and construction of the integrated control and safety systems and telecom scope.
[12] The technical assurance, risk and safety, asset management, and industrial inspection were done by Germanischer Lloyd.