Line 1 opened on 29 December 2019.
[2] The first phase of Line 1 is 21.719 km (13.5 mi)[3] long.
The color for Line 1 is red.
[5] Line 1 began construction in April 2016 and was opened on 29 December 2019.
[1][3] The first phase of Line 2 is 27.32 km (17.0 mi)[4] long.