Hoima–Kaiso–Tonya Road is a road in the Western Region of Uganda, connecting the city of Hoima with the towns of Kaiso and Tonya on the shores of Lake Albert in the oil-rich Albertine Graben.
The road starts at Hoima and continues west through Kaiso, and ends in Tonya, a distance of approximately 92 kilometres (57 mi).
[1] The road passes through the village of Kabaale, in Buseruka County, the location of the Uganda Oil Refinery.
[2] The upgrading of the road involved the conversion of the existing gravel surface to tarmac and the building of bridges and drainages.
Kolin Insaat Turim Sayani Ve Tecaret, a Turkish construction firm, won the tender to build the road at an estimated cost of USh:320 billion (US$125 million).