The ship was built by the Garden Reach Shipbuilders and Engineers (GRSE), Kolkata, launched on 26 March 2013, and commissioned on 16 October 2017.
Kiltan represents a leap forward in the Navy's attempts at localisation with as much as 90% of its content drawn from India itself.
It will be a frontline warship of the Indian Navy with advanced stealth features and a low radar signature that enhances its anti-submarine warfare capability.
[9] Kiltan is India's first ship to have a superstructure of carbon fibre composite material that has been integrated with its main hull, resulting in lower top weight and maintenance costs and improved stealth features.
On 6 May 2024, the flotilla reached Singapore for a three day visit as a part of operational deployment of the Navy's Eastern Fleet to the South China Sea.
[20] On 23 May the flotilla completed its visit to Philippines which was a part of the Operational Deployment of the Eastern fleet to the South China Sea.