IRB Infrastructure

The project also included improvement of a 93.302 km section of the existing Ahmedabad – Vadodara Expressway (NE 1), on a Design Building Finance Operate and Transfer (DBFOT) basis.

[14][15] In 2012, IRB acquired Tamil Nadu based BOT road builder MVR Infrastructure and Tollways for ₹130 crore.

[18][19] IRB Infrastructure Developers Ltd. signed a contract worth ₹2,100 crore from NHAI for a six-lane project in Rajasthan and Gujarat.

The concession period of this project is 20 years from the appointed date, including 910 days of construction, creating smoother transit.

[23] In March 2018, IRB Infrastructure won two hybrid annuity projects under NHDP phase IV in the state of Tamil Nadu, which included the four laning of NH-45A Puducherry to Poondiyankuppam and Poondiyankuppam to Sattanathapuram at a cost of ₹2,169 crore at a cost of ₹1,296 crore.

[34] The company was given the CNBC TV 18 Essar Steel Infrastructure Excellence Award for the second time for its high quality work implemented on the Bharuch to Surat section of NH-8 under Highways and Bridges Category.

The company also won the CNBC TV 18 Essar Steel Infrastructure Excellence Award in the Highways & Flyovers category for Mumbai-Pune section of NH-4 in 2009.