The Airports Authority of India (AAI) conducted a pre-feasibility study in July 2013 for development of the airport[1] and approved of operations of aircraft under Visual Flight Rules (VFR) conditions.
[5] The airport was chosen for an upgrade under the Government's UDAN scheme and the ground breaking ceremony for the construction of a terminal building was performed in January 2017.
[8] On 21 September 2020, Alliance Air started flights to Hyderabad and Raipur using an ATR-72 aircraft.
This airport is expected to be set up in an area measuring 250 hectares.
Since about 92% (229 hectares) of the land required is owned by the government, the land acquisition process is expected to be quick leading to a faster development time for the airport.