KRI Teluk Cirebon

KRI Teluk Cirebon (543) is a Frosch II-class amphibious logistic ship operated the Indonesian Navy.

KRI Teluk Cirebon is a Project 109 (NATO reporting name: Frosch II) amphibious logistic support ship.

The ship has 650 long tons (660 t) of cargo capacity and also equipped with a 5-tons crane in amidships.

The ship was laid down on 26 January 1978, launched on 30 August 1978 and was commissioned to Volksmarine on 3 October 1979.

[3][4] The unified German Navy didn't take over the ship and she was laid up at Peenemünde Naval Base.