Built in the Renewable Energy Resource Area (YEKA) in Karapınar district in Konya Province, the plant has 1,300 MW installed power and covers an area of 20 square kilometres (7.7 sq mi).
The project includes a factory annually producing 500 MWp photovoltaic solar modules and a R&D Center.
[1] The tender for the construction was won in 2017 by a consortium of the Turkish Kalyon Group and South Korea's Hanwha, which offered the lowest kW·h-price with 6.99 US cent valid for an energy purchase term of 15 years.
[5] The solar power station generates 1,700 GWh annually, sufficient to supply 600,000 households.
[3] The site was reported to have been selected because formerly agricultural land had been desertified by climate change in Turkey.