Kemerburgaz (Istanbul Metro)

Kemerburgaz is an underground station on the M11 line of the Istanbul Metro in Eyüp.

[1] It is located below Selanik Boulevard on the west side of the town of Kemerburgaz.

Construction of the station began in 2016, along with the entire route from Gayrettepe to the Istanbul Airport.

On 19 January 2024, during the construction of piles on the surface between Kemerburgaz and Göktürk, the drilling machine pierced the tunnel wall and damaged the rails and catenary line.

Due to the repair caused by this damage, the northbound platform is temporarily out of use as a single line operation is provided between Hasdal and Göktürk.